Roofing
Residential
Mahwah, NJ
January 2025

Full Roof Replacement

Project Overview

This project involved a complete roof tear-off and replacement on a high-end two-story brick residence. Sweet Home Construction executed a full removal of the aging asphalt system, installed a new underlayment and moisture barrier, and completed the work with architectural shingles designed for longevity, energy efficiency, and curb appeal.

Process

- Tear-off & deck inspection: 2 days - Underlayment & flashing: 1 day - Shingle installation & ridge venting: 2 days - Final cleanup & walkthrough: 1 day **Total duration:** ≈ 6 days

Project Details

Key Highlights

- Dark-brown architectural shingles harmonize with the brick façade and white colonial columns. - Complex roof geometry integrates hip, valley, and dormer elements for a refined, dimensional look. - Copper-tone metal roof accents over bay windows add visual warmth and tie into the earth-tone palette. - Clean ridge lines and symmetrical shingle patterns enhance the home’s stately front elevation.